Our timber construction system, end to end
Our cabins are manufactured, not improvised on site. That single fact is what makes the price, the programme and the quality predictable — here is how the system actually works.
Cut in the factory, assembled on your site
Every wall log, roof member and piece of joinery is machined in the factory to fixed dimensions, from a drawing, under cover. Nothing structural is cut to fit in your garden. What arrives is a kit of parts that go together in a defined sequence.
This matters for more than tidiness. Factory machining gives tolerances that hand-cutting on a wet site cannot match, and tight tolerances are what produce a weather-resistant building in a wind-driven-rain climate. It also means waste is generated and dealt with at the factory rather than in a skip outside your house.
What arrives, and in what order it goes up
The delivery includes the concrete foundation blocks, the wall logs, the roof structure and covering, the joinery, the standard floor and roof insulation and the fixings. The crew comes with it.
Assembly follows the same sequence every time, which is why the on-site phase is measured in days: set and level the foundation blocks, lay the floor structure and insulation, raise the log walls course by course, frame and cover the roof, fit the joinery, then complete the insulation and internal work.
Where the work happens
| In the factory | Milling wall logs and corner notches, making up joinery, cutting roof components, quality checks |
|---|---|
| On your site, by us | Setting foundation blocks, floor, log walls, roof, joinery, standard insulation, handover checks |
| On your site, by others | Significant ground levelling, electrical installation and certification, connection to water and drainage |
| Typical programme | 8–10 weeks from order to handover; the on-site assembly itself takes days |
Shell or turnkey — the same structure, a different finish line
Both versions are the identical building. The difference is how far we take it before handing over, and it is worth choosing deliberately rather than by price alone.
The shell version gives you the completed, weathertight structure with joinery and the standard insulation, assembled on its foundation blocks. It suits anyone with their own trades or the time to finish the inside themselves, and it is the lower entry cost. The turnkey version adds hot, cold and drainage pre-installation for the bathroom and a shower, toilet and sink kit fitted, so the wet areas are done.
Worth knowing: Neither version includes electrical work. It is quoted and carried out separately by the electrical contractor we work with, because the installation has to be certified by a registered electrician and the scope depends on your existing supply and site.
Built for Irish conditions, not adapted to them
The specification choices across the system point in the same direction: corner-notched solid log walls for racking strength against wind, generous roof overhangs and steel roof covering for wind-driven rain, a three-layer roof build-up for moisture as well as heat, and timber joinery that moves at the same rate as the walls around it.
What the system cannot do is compensate for a site that was never prepared properly. A level, free-draining base with space for water to get away from the building is the foundation of everything else, which is why we would rather survey the site before confirming a quote than after.
Frequently asked
Is this a log cabin or a timber frame building?
A log cabin: the walls are solid machined Nordic logs of 44–70 mm that form the structure themselves, rather than a stud frame with separate cladding. The two behave quite differently — log walls move seasonally and are a finished surface inside and out.
How long does the build take on site?
Days, not months. Lead time from order to handover is typically 8–10 weeks, most of which is manufacture and scheduling. Once the crew is on site with the materials, the structure goes up quickly because every component is pre-cut.
Do I need to prepare the site before delivery?
You need a reasonably level area with access for the delivery and the crew. The concrete foundation blocks are included and set by us. Significant levelling, cut-and-fill or a stepped base on a slope is quoted separately once we have seen the fall.