Showroom by appointment Call 087 104 5272
Supplied & installed in Limerick city and county

Timber Cabins & Garden Rooms in Limerick

Insulated Nordic timber cabins from €14,500 incl. VAT, with delivery, professional assembly and a 10-year structural warranty.

Limerick is a single local authority — Limerick City and County Council — which makes it one of the more straightforward counties to deal with: one planning office, one set of forms, whether your site is in Castletroy or out past Newcastle West. The drive from our Dublin yard is about two hours, so a Limerick install runs on the same schedule as a Leinster one.

The strongest demand we see in Limerick is for accommodation rather than offices: granny flats and auxiliary dwellings on family sites, and compact homes for adult children. The suburbs around the city — Castletroy, Dooradoyle, Annacotty, Raheen — have the garden depth that makes a mid-sized model realistic rather than a squeeze.

Where we install in Limerick

We cover the whole of Limerick city and county. These are the places we are asked for most often — if your address is not listed, it is still inside our delivery area.

  • Limerick city
  • Castletroy
  • Dooradoyle
  • Annacotty
  • Raheen
  • Adare
  • Newcastle West
  • Abbeyfeale
  • Kilmallock
  • Patrickswell
  • Croom
  • Rathkeale

Delivery, access and ground conditions

Limerick is about 200 km from our Dublin yard, roughly two hours on the M7. Transport and professional assembly are included in the price.

What people in Limerick build

Granny flats and auxiliary dwellings

The exemption for a detached auxiliary dwelling of 32–45 m² to the rear of the main house, in force since July 2026, fits several of our models directly. The council must be notified 14 days before work starts.

Homes for adult children

A two-bedroom cabin on the family site is a realistic answer to Limerick house prices. Shell versions keep the entry cost down if you have your own trades.

Garden offices and studios

University and tech employment around Castletroy and the National Technology Park drives steady demand for insulated 20–25 m² garden offices inside the garden-room exemption.

Models we recommend in Limerick

Every price includes delivery to your Limerick site, assembly by our own crew and a 10-year structural warranty.

Compare all 13 models →

Planning permission in Limerick

The planning exemptions are national, not local. Since 27 July 2026 a back-garden structure such as a home office, studio, gym or store can be exempt from planning permission up to 30 m² (previously 25 m²), and a detached auxiliary dwelling of 32–45m² to the rear of the main house, connected to its services, can be exempt with 14 days’ notice to the council.

What does change locally is everything around the size limit: zoning, scenic and conservation designations, protected structures and the conditions on siting and remaining open space. That makes your local authority the only reliable answer for your specific site:

Exemption figures last reviewed 18 September 2026. Source: South Dublin County Council — New Exemptions 27.07.26. This is general information, not legal advice — always confirm with your local authority or a planning professional before ordering.

Timber cabins in Limerick — FAQs

Do you deliver timber cabins to Limerick?

Yes. We deliver and assemble across Limerick city and county, including Limerick city, Castletroy, Dooradoyle, Annacotty, Raheen, Adare and the surrounding area. Limerick is about 200 km from our Dublin yard, roughly two hours on the M7. Transport and professional assembly are included in the price. Prices start from €14,500 incl. VAT with delivery and professional assembly included, so there is no separate transport charge for a Limerick address.

Do I need planning permission for a garden room in Limerick?

The exemptions are national rather than county-specific. Since 27 July 2026 a back-garden structure such as a home office, studio or gym can be exempt up to 30 m², and a detached auxiliary dwelling of 32–45 m² to the rear of the main house can be exempt with 14 days' notice to the council. Conditions apply in every case, and local designations can change what is allowed, so confirm your site with Limerick City and County Council.

How long does installation take in Limerick?

Typical lead time is 8–10 weeks from order to handover. The on-site assembly itself is measured in days, not months, and is carried out by our own crew. Limerick is about 200 km from our Dublin yard, roughly two hours on the M7. Transport and professional assembly are included in the price.

Which model suits a site in Limerick?

Granny flats and auxiliary dwellings is the most common brief we get in Limerick. The exemption for a detached auxiliary dwelling of 32–45 m² to the rear of the main house, in force since July 2026, fits several of our models directly. The council must be notified 14 days before work starts. Send us the garden dimensions and the intended use and we will recommend a model and send a written quote for shell and turnkey versions.

Planning a cabin in Limerick?

Tell us the intended use, the garden size and the access, and we will recommend a model and send a written quote for shell and turnkey versions — with delivery to Limerickincluded.