Timber Cabins & Garden Rooms in Tipperary
Insulated Nordic timber cabins from €14,500 incl. VAT, with delivery, professional assembly and a 10-year structural warranty.
Tipperary is one of the largest inland counties and it is worth saying plainly that Nenagh and Clonmel are an hour and a half apart — this is not a county you cover from one base. Since 2014 it has been a single local authority, which at least makes the planning side simpler than the geography.
The Golden Vale gives Tipperary some of the best agricultural ground in the country, and good farmland generally makes good building ground: firm, level and free-draining. Most of what we build here goes on family sites rather than in estate gardens.
Where we install in Tipperary
We cover the whole of County Tipperary. These are the places we are asked for most often — if your address is not listed, it is still inside our delivery area.
- Clonmel
- Thurles
- Nenagh
- Cashel
- Tipperary town
- Carrick-on-Suir
- Roscrea
- Templemore
- Cahir
- Newport
Delivery, access and ground conditions
Tipperary is 160–180 km from our Dublin yard depending on which end of the county, roughly two hours by road. Transport and assembly are included.
Golden Vale ground is firm, level and free-draining — among the most straightforward conditions we work in.
The uplands — the Galtees, Knockmealdowns and Slieve Felim — are a different proposition: more exposed, more sloped, and specified accordingly.
Land beside the Suir and the Shannon can flood. On low-lying riverside plots the building is raised and drainage settled before assembly.
Distances within the county are long. Tell us which end you are on when you enquire, because it affects scheduling more than it does price.
What people in Tipperary build
Family homes on farm and family sites
The main brief here. Larger models as permanent homes, needing planning permission above the exemption sizes, with drawings and specifications supplied for the application.
Auxiliary dwellings and granny flats
A detached 32–45 m² dwelling to the rear of the main house can be exempt since July 2026, subject to conditions and 14 days' notice to the council.
Garden offices and studios in the towns
Clonmel, Thurles and Nenagh gardens take an insulated 20–30 m² room inside the garden-structure exemption.
Models we recommend in Tipperary
Every price includes delivery to your Tipperary site, assembly by our own crew and a 10-year structural warranty.
Planning permission in Tipperary
The planning exemptions are national, not local. Since 27 July 2026 a back-garden structure such as a home office, studio, gym or store can be exempt from planning permission up to 30 m² (previously 25 m²), and a detached auxiliary dwelling of 32–45m² to the rear of the main house, connected to its services, can be exempt with 14 days’ notice to the council.
What does change locally is everything around the size limit: zoning, scenic and conservation designations, protected structures and the conditions on siting and remaining open space. That makes your local authority the only reliable answer for your specific site:
Exemption figures last reviewed 18 September 2026. Source: South Dublin County Council — New Exemptions 27.07.26. This is general information, not legal advice — always confirm with your local authority or a planning professional before ordering.
Timber cabins in Tipperary — FAQs
Do you deliver timber cabins to Tipperary?
Yes. We deliver and assemble across County Tipperary, including Clonmel, Thurles, Nenagh, Cashel, Tipperary town, Carrick-on-Suir and the surrounding area. Tipperary is 160–180 km from our Dublin yard depending on which end of the county, roughly two hours by road. Transport and assembly are included. Prices start from €14,500 incl. VAT with delivery and professional assembly included, so there is no separate transport charge for a Tipperary address.
Do I need planning permission for a garden room in Tipperary?
The exemptions are national rather than county-specific. Since 27 July 2026 a back-garden structure such as a home office, studio or gym can be exempt up to 30 m², and a detached auxiliary dwelling of 32–45 m² to the rear of the main house can be exempt with 14 days' notice to the council. Conditions apply in every case, and local designations can change what is allowed, so confirm your site with Tipperary County Council.
How long does installation take in Tipperary?
Typical lead time is 8–10 weeks from order to handover. The on-site assembly itself is measured in days, not months, and is carried out by our own crew. Tipperary is 160–180 km from our Dublin yard depending on which end of the county, roughly two hours by road. Transport and assembly are included.
Which model suits a site in Tipperary?
Family homes on farm and family sites is the most common brief we get in Tipperary. The main brief here. Larger models as permanent homes, needing planning permission above the exemption sizes, with drawings and specifications supplied for the application. Send us the garden dimensions and the intended use and we will recommend a model and send a written quote for shell and turnkey versions.
Useful reading for a Tipperary site
Planning a cabin in Tipperary?
Tell us the intended use, the garden size and the access, and we will recommend a model and send a written quote for shell and turnkey versions — with delivery to Tipperaryincluded.


